MADE Training > Session 5 > 5.1 Maintenance Cost Estimates
Session 5.1: Maintenance Cost Estimates
Session 5 takes place in the RAM module and focuses on Maintenance: Maintenance Cost Estimate, Maintenance Actions, Reliability Centred Maintenance (Classic), and Reliability Centred Maintenance (Back-Fit).
Note: Users can define custom maintenance terminologies suitable for their application in Application Preferences > Modeling > Maintenance Type Terminologies. These terminologies are displayed in all the maintenance features mentioned above.
Session 5.1 Outline
- 5.1.1: MCE Management
- 5.1.2: MCE Summary & Details
- 5.1.3: Charting & MCE Report
Discussion 5.1: Maintenance Cost Estimates
- MCE generates and compares costs of maintenance procedures over the operational timespan of an item
- Typically used in early stages of the design lifecycle to estimate and predict the total maintenance costs
- Can be used to detail the maintenance and support aspect of lifecycle costs
Discussion 5.1.1: MCE Management
- This page is used to create, store and edit MCE analyses
- The page also provides an overview for a specific analysis
Exercise 5.1.1: Create a New MCE Analysis
- Select the new-analysis icon to create a new MCE analysis
- Enter the MCE Name: Training MCE
- Enter the MCE Description: Maintenance Cost estimation for the Power Generation system.
Edit Applied Environment
- Select the icon to choose an applied environment
- Under User Library select Benign Environment
- Select to close dialog and select applied environment
- Verify that Environmental Loading Factor (ELF) is: 0.59
Note: The ELF is calculated based on the selected environment.
Discussion 5.1.2: MCE Page
- After a new MCE analysis has been created, maintenance and item costs must be estimated (MCE is a bottom-up approach)
- Accessed by selecting the new analysis and clicking Open
- This page defines the estimated cost of sustainment for the system based on the component maintenance actions
- If item maintenance estimates are unknown, costs can be estimated at the subsystem level (less detailed/rough estimates; lower-level component estimates can be updated later)
Exercise 5.1.2: Add Breakdown Repair for Fuel Tank Component
- Select Training MCE then select Open
- Expand the system tree and select Fuel Tank
- Under Proposed Maintenance Approach section:
- Select Maintenance Category: Breakdown Maintenance
- Select Maintenance Type: Breakdown Repair
- Select the Cost tab and enter:
- Acquisition cost: $500
- Cost of Failure: $10,000
- Downtime cost: $1,000
- Personnel cost: $100 (per person per hour)
- Equipment Renewal Factor: 2.00
- Tools & Equipment Cost: $500
- Consumables Cost: $100
- Select the Maintenance tab and enter:
- Maintenance Supplier: ACME Inc.
- Maintenance Country: Australia
- Estimated MTTF: 10,000 Hours
- Maintenance Time: 1 Hour
- No. of Personnel: 1
- Verify Total Cost: $1672.11
- Verify Cost per Hour: $18.36
Exercise 5.1.3: Add Scheduled Service for Control Unit Component
To add expected maintenance for an item:
- Select
Control Unitfrom the System Breakdown tree - Under Proposed Maintenance Approach section:
- Set Maintenance Category to Scheduled Maintenance
- Set Maintenance Type to Scheduled Service
- Select the Cost tab and enter:
- Acquisition cost: $2000
- Downtime cost: $1,000
- Personnel cost: $100 (person per hour)
- Equipment Renewal Factor: 1.00
- Tools & Equipment Cost: $100
- Consumables Cost: $100
- Spares Cost Factor: 1
- Select the Maintenance tab and enter:
- Maintenance Supplier: ACME Inc.
- Maintenance Country: Australia
- Estimated MTTF: 10,000 Hours
- Maintenance Interval: 800 Hours
- MTTR: 2 Hours
- No. of Personnel: 1
- Verify Total Cost: $1,022.62
- Verify Cost per Hour: $11.23
Exercise 5.1.4: Add Condition Based Replace for Coupling Component
- Select
Coupling 1from the system tree - Under Proposed Maintenance Approach section:
- Select Maintenance Category: Condition Based Maintenance
- Select Maintenance Type: Condition Based Replace — Continuous Monitoring
- Select the Cost tab and enter:
- Acquisition cost: $250
- Downtime cost: $10,000
- Personnel cost: $100 (person per hour)
- Equipment Renewal Factor: 1.00
- Maintenance Tools & Equipment Cost: $100
- Maintenance Consumables Cost: $100
- Maintenance Spares cost factor: 0
- Detection Tools & Equipment Cost: $50
- Detection Consumables Cost: $0
- Select the Maintenance tab and enter:
- Maintenance Supplier: ACME Inc.
- Maintenance Country: Australia
- Estimated MTTF: 1,000 Hours
- Requires shutdown (Maintenance): Yes
- Maintenance Interval: 750 Hours
- MTTR: 0.5 Hours
- No. of Personnel: 2
- Requires shutdown (Detection): No
- Detection Interval: 250 hours
- Detection Time: 5 minutes
- No. of Personnel (Detection): 1
- Verify Total Cost: $1,357.20
- Verify Cost per Hour: $14.90
Discussion 5.1.5: Charting & MCE Report
Once all relevant analysis information has been provided, the user can view the breakdown of the MCE analysis in the Overview/Management page.
Exercise 5.1.5: Generate a MCE Report
- Select Reports > Report Wizard
- Select Maintenance Cost Estimates Report
- Select Next
- Select Training MCE and select Next
- Set formatting or select Generate to generate the report
Session 5.1 Summary
MCE Analysis for Fuel Tank, Control Unit & Coupling components:
- Determine Total MCE per item/cost per operating hour
- Generate MCE Report